toggle background image
Staging
Some navigation will not work unless JavaScript is enabled
 All Links: Showv | Hide^ 

ITP Help

Special Requests

Dates/Hours v

Curriculum v

ITP Resources v

Off Floor Resources v

Tech Notes v

ITP Community v

Showing Work v

Thesis v

Servers v

ITP Policies v

Orientation/Registration v







Facilities / Staging

Fall 2011 Staging

Begins on Monday, Nov. 7

Ends on Friday, Dec. 9

Requirements and Important Info

Locations: Staging will take place in the Lobby, Hallways and Lounge areas. No projects will be assigned to the Japanese Room. The Japanese Room will remain an open quiet room with support for project storage Storage Request Form, Soft Materials and Sewing, Wet Lab and Documentation.
Project Storage: If you are requesting staging space for project storage only, you should be using the Storage Request Form to request a spot in the Japanese Room for your project. Additional spaces are being added.
User Testing and Show and Tell: If assigned a staging space, you are required to be available on Fridays (times to be determined or scheduled) for user testing by outside visitors. If you are assigned a long term space, early appointments will focus on you talking with visitors about the project's current state, explaining its concept, your design principles, the intended user scenario and demonstrating measured progress.
Documentation: Those assigned staging space are required to provide additional documentation in a group blog for the ITP website. Currently under construction.
The Winter Show: Submission and acceptance to Staging DOES NOT automatically carry over to the Winter Show. You must still associate your project with the Show venue once open and follow all announced and published deadlines.

Submission Process - OPEN!!

  • Staging space is assigned based on submissions to the Projects Database: http://itp.nyu.edu/projects for a FIXED LENGTH OF TIME (i.e.: 1 week, 2 weeks, 3 weeks, etc.)
    • Use the venue Staging Fall 2011
  • Submissions are considered on the goal of staging as many well planned projects as possible in the space available.
  • Your ability to work in a smaller footprint or in a GROUPED (Multiple Projects) spot increases the likelihood that you will be assigned space
  • Submissions must contain the following:
    • Elevator Pitch
    • Description
    • Attachments
      • A sketch is REQUIRED
    • Team Members and Point Person
    • Class(es)

Conditions Apply...

  • Assigned spaces must be kept organized and safe
  • Tables are NOT guaranteed
  • Black curtains may ONLY be used when needed for image capture or projection needs - NOT for privacy. When not in use, the curtains MUST be tied back.
  • Labeling all materials and spaces in required
  • Shop Tools, including soldering stations may not be horded - it is recommended that if you are assigned a staging space that you invest in providing your own soldering station and the small tools that you will require on a regular basis

Staging Locations...

This Map represents currently approved/assigned Staging projects:

 Randai Pants
 52M
 The Movement
 procedure
 Sound Signatures
 Plexiglas Love Cage
 Magnetotron
 Walking with Yayoi Kusama
 Fixed Length of Time
 Education building block
 #BKME
 The HighLine Project
 I Heart Photo
 Theremin orchestra controller
 Neurhyme
 Volumes of Voices
 Bureau for Dimensional Research
 Mind, Motion and Color
 Getting the Job Done
 Stop + Frisk
 Stopover on a Quiet Street
 Robot Facade
 DIY wearable accessories.
 Pilot
 Forever (Box)
 Liquid Jade
 Dollhouse
 Pop up video sculpture
 x + y = <3
 accelul8r
 ITP Corkboard
 Augmented Body
 ITP Thesis Archive Server Rescue
 Bench Shelf
 1K-KDEEP
 Mortal Compass
 Interactive Fish Tank
 Intimate Toilet
 The Biomechanical Advantage Chair: the PodChair
 Sex Ed Mannequin (tentative)
 String (Working Title)
 Kinetic Sculpture 6

LINK to full size .PDF of Map above

Page last modified on November 22, 2011, at 04:00 PM