Ceiling
Some navigation will not work unless JavaScript is enabled
All Links: Showv | Hide^
Special Requests
Highlighted FAQs
SPACE
FALL 2013 INFO
SUMMER COURSE INFO
HEALTH
FLOOR 411*
- Labs
- Lab Policy
- Audio Help
- Video Help
- Equipment Room
- ER Check In Out Mandatory Session
- Checkout Policy
- Equipment Lists
- Classrooms
- Rooms Schedule
- Room Reservations/Policy
- Facilities
- Wireless Computing
- On-Floor Printing
- Floor Map
- Staging Space
- Physical Computing
- Announcements
- Policy
- Safety
- Project Storage
- Shop
- Safety
- Laser Cutter
- ** New ** Bobst Library Guide for ITP
- Advanced Media Studio
- Materials Connexion
- Fabricators
Help / Ceiling
Help.Ceiling History
Hide minor edits - Show changes to output
Added line 21:
* Installing AutoPoles should be done only in consultation with the Tech Staff
Changed lines 1-2 from:
! '''ITP Ceiling Update 11/17'''
to:
! '''ITP Ceiling Update 11/24'''
Changed lines 1-2 from:
! %red%ITP Ceiling Update 11/17
to:
! '''ITP Ceiling Update 11/17'''
Changed line 6 from:
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
to:
* %red%'+Limited Weekday Floor Access during Winter Break: 12/20/08 - 1/18/09+'
Changed line 5 from:
* %red%'+Repairs begin on Friday, December 20th+'
to:
* %red%'+Repairs begin on Saturday, December 20th+'
Changed lines 3-6 from:
to:
This page will be updated regularly with information regarding Ceiling Repairs
* %red%'+Repairs begin on Friday, December 20th+'
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
* %red%'+Repairs begin on Friday, December 20th+'
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
Changed lines 11-13 from:
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
to:
Changed lines 8-10 from:
* %red%Repairs begin on Friday, December 20th
** %red%Limited Floor Access during Winter Break: 12/20/08 - 1/18/09
to:
* %red%'+Repairs begin on Friday, December 20th+'
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
* %red%'+Limited Floor Access during Winter Break: 12/20/08 - 1/18/09+'
Changed lines 8-10 from:
* Future work dates will be listed here
**Scheduled work to be done during the Winter Break
to:
* %red%Repairs begin on Friday, December 20th
** %red%Limited Floor Access during Winter Break: 12/20/08 - 1/18/09
** %red%Limited Floor Access during Winter Break: 12/20/08 - 1/18/09
Deleted line 23:
Changed lines 1-2 from:
! %red%ITP Ceiling Update
to:
! %red%ITP Ceiling Update 11/17
Changed lines 5-6 from:
* Work began on 9/29 to address cracks in Red's Office
* Additional testing will be conducted in the Lounge spaces and in all Admin Hall Offices beginning October 8th
to:
* Work began on 9/29 to address cracks in Red's Office and the collapse in the Lounge from September
* Additional testing has been conducted in the Lounge spaces and in all Admin Hall Offices indicating where repairs will be addressed during the winter break
* Additional testing has been conducted in the Lounge spaces and in all Admin Hall Offices indicating where repairs will be addressed during the winter break
Changed lines 9-10 from:
to:
**Scheduled work to be done during the Winter Break
Deleted line 12:
Changed lines 20-21 from:
* Even hanging black curtains will be done using AutoPoles and cross poles
* All installations or projects requiring space on the floor should first set up an appointment with Rob to review installation and material quidelines
to:
* Even hanging black curtains will be done using AutoPoles and cross poles where necessary
* All installations or projects requiring space on the floor must first set up an appointment with Rob to review installation and material quidelines
* When it comes time for the Show, consultations with the Tech Staff will be required for installations needing to hang or mount anything other than a kiosk/table top setup
* All installations or projects requiring space on the floor must first set up an appointment with Rob to review installation and material quidelines
* When it comes time for the Show, consultations with the Tech Staff will be required for installations needing to hang or mount anything other than a kiosk/table top setup
Changed line 19 from:
* No installations or equipment will be permitted to use the ceiling or cable trays until further notice
to:
* No installations or equipment will be permitted to use the ceiling or cable trays for hanging things until further notice
Changed lines 3-6 from:
* This page will be updated regularly regarding what is taking place with the ceiling problems
* Because we are working with several parties (NYU's Planning and Construction Office, TSOA Building Management, an independent structural engineer and contractors) evaluations and plans are still being made
* Work began on 9/29 to address cracks in Red's Office and Lounge areas
* Additional work will need to be done in the public Lounge spaces and in all Admin Hall Offices (date to be determined)
*
*
*
to:
* This page will be updated regularly with information regarding Ceiling Repairs
* Because we are working with several parties (NYU's Planning and Construction Office, TSOA Building Management, an independent structural engineer and contractors) evaluations and plans are still unfolding
* Work began on 9/29 to address cracks in Red's Office
* Additional testing will be conducted in the Lounge spaces and in all Admin Hall Offices beginning October 8th
* Because we are working with several parties (NYU's Planning and Construction Office, TSOA Building Management, an independent structural engineer and contractors) evaluations and plans are still unfolding
* Work began on 9/29 to address cracks in Red's Office
* Additional testing will be conducted in the Lounge spaces and in all Admin Hall Offices beginning October 8th
Changed line 12 from:
* In addition to keeping a temporary cordon around the areas deemed too risky to populate, this will effect how we do business around ITP, especially installation and project setup
to:
* In addition to keeping a temporary cordon around the areas being worked on or evaluated, this will effect how we do business around ITP, especially installation and project setup
Changed lines 10-11 from:
! How does this effect the Floor?
to:
!! How does this effect the Floor?
Added lines 3-4:
* This page will be updated regularly regarding what is taking place with the ceiling problems
* Because we are working with several parties (NYU's Planning and Construction Office, TSOA Building Management, an independent structural engineer and contractors) evaluations and plans are still being made
* Because we are working with several parties (NYU's Planning and Construction Office, TSOA Building Management, an independent structural engineer and contractors) evaluations and plans are still being made
Changed line 6 from:
* Additional work will need to be done in all Admin Hall Offices (date to be determined)
to:
* Additional work will need to be done in the public Lounge spaces and in all Admin Hall Offices (date to be determined)
Added lines 8-12:
* Future work dates will be listed here
! How does this effect the Floor?
* In addition to keeping a temporary cordon around the areas deemed too risky to populate, this will effect how we do business around ITP, especially installation and project setup
! How does this effect the Floor?
* In addition to keeping a temporary cordon around the areas deemed too risky to populate, this will effect how we do business around ITP, especially installation and project setup
Changed lines 14-15 from:
* No additional installations or equipment will be permitted to use the ceiling or cable trays until further notice
* All installations or projects requiring space on the floor should first set up an appointment with Rob
*
to:
** This room will be dynamic and configured based on needs of the community at any given time
** Current Setup of JRoom:
*** Documentation Station
*** Sewing Stations
*** Staging Space for larger projects
* No installations or equipment will be permitted to use the ceiling or cable trays until further notice
* Even hanging black curtains will be done using AutoPoles and cross poles
* All installations or projects requiring space on the floor should first set up an appointment with Rob to review installation and material quidelines
** Current Setup of JRoom:
*** Documentation Station
*** Sewing Stations
*** Staging Space for larger projects
* No installations or equipment will be permitted to use the ceiling or cable trays until further notice
* Even hanging black curtains will be done using AutoPoles and cross poles
* All installations or projects requiring space on the floor should first set up an appointment with Rob to review installation and material quidelines
Changed line 23 from:
* [[Help/FloorMapCeiling | Map of closed off areas]]
to:
* [[Help/FloorMapCeiling | Map of areas impacted]]
Added line 7:
* No additional installations or equipment will be permitted to use the ceiling or cable trays until further notice
Changed line 7 from:
* All on-floor installations should or projects requiring space on the floor should first setup an appointment with Rob
to:
* All installations or projects requiring space on the floor should first set up an appointment with Rob
Deleted line 8:
Added lines 5-9:
* Only areas determined to be safe will be open to the community
* The Japanese Room has been reopened and is available as additional lounge and staging space
* All on-floor installations should or projects requiring space on the floor should first setup an appointment with Rob
** [[https://itp.nyu.edu/inwiki/Signup/Ryan | Rob's Office Hours ]]
* The Japanese Room has been reopened and is available as additional lounge and staging space
* All on-floor installations should or projects requiring space on the floor should first setup an appointment with Rob
** [[https://itp.nyu.edu/inwiki/Signup/Ryan | Rob's Office Hours ]]
Changed lines 4-5 from:
* Additional work will need to be done in all Admin Hall Offices
to:
* Additional work will need to be done in all Admin Hall Offices (date to be determined)
* [[Help/FloorMapCeiling | Map of closed off areas]]
* [[Help/FloorMapCeiling | Map of closed off areas]]
Changed lines 1-5 from:
to:
! %red%ITP Ceiling Update
* Work began on 9/29 to address cracks in Red's Office and Lounge areas
* Additional work will need to be done in all Admin Hall Offices
* Work began on 9/29 to address cracks in Red's Office and Lounge areas
* Additional work will need to be done in all Admin Hall Offices