(edit sidebar)
Intro to Physical Computing Syllabus

Research & Learning

Other Class pages

Shop Admin

ITP Help Pages
Tom's pcomp site
DanO's pcomp site


Cleanup

Policy.Cleanup History

Hide minor edits - Show changes to output

Changed lines 1-2 from:
If you're taking a physical computing class this semester, or if you're planning a physical computing project for your thesis or another class, you need to sign up for TWO DAYS of shop cleanup during the semester.
to:
If you're taking a physical computing class this semester, or if you're planning a physical computing project for your thesis or another class, you need to sign up for TWO DAYS of shop cleanup during the semester. This means you're expected to show up half an hour before shop closing time, and see to it that the shop is clean and neat.

Anyone in the shop who's working at closing time should help, so don't do it alone. Ask your fellow classmates in the shop for assistance.  If you're there at closing time, help out, even if you're not on clean-up duty that night.

If the shop is left a mess, it will be closed until it is cleaned
.
Deleted line 16:
Deleted line 27:
Deleted line 34:
Deleted lines 41-42:

Deleted line 50:
Changed lines 24-42 from:
** [[ http://itp.nyu.edu/physcomp/images/toolcabinet/bigcabinettop.jpg|Large Cabinet Top]]
** Both Cabinets
** Clamp drawer
** Drillbits
** Goggles and safety gear
** Hammers
** Handsaws, blades, etc.
** Multimeters
** Nut drivers
** Pliers
, tin snips, etc.
** Rivet tools
** Sandpaper, dremel, etc.
** Screwdrivers
** Sockets
** Tape, Staple Guns, etc.
** Tape Measures
** Wire Cutters
** Cutting
Blades
to:
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/bigcabinettop.jpg | Large Cabinet Top]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/cabinets.jpg | Both Cabinets]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/clamps.jpg | Clamp drawer]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/drillbits.jpg | Drillbits]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/goggles.jpg | Goggles and safety gear]]

**[[http://itp.nyu.edu/physcomp/images/toolcabinet/hammers.jpg | Hammers]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/handsaws.jpg | Handsaws, blades, etc.]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/multimeters.jpg | Multimeters]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/nutdrivers.jpg | Nut drivers]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/pliers_snips.jpg | Pliers, tin snips, etc.]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/punched_rivetguns.jpg | Rivet tools]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/./sandpaper:dremel.jpg | Sandpaper, dremel, etc.]]

**[[http://itp.nyu.edu/physcomp/images/toolcabinet/screwdrivers.jpg | Screwdrivers]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/sockets.jpg | Sockets]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/tape_stapleguns.jpg | Tape, Staple Guns, etc.]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/tapemeasures.jpg | Tape Measures]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/wirecutters.jpg | Wire Cutters]]
**[[http://itp.nyu.edu/physcomp/images/toolcabinet/xacto_cuttingtools.jpg | Cutting
Blades]]


Changed line 24 from:
** Large Cabinet Top
to:
** [[ http://itp.nyu.edu/physcomp/images/toolcabinet/bigcabinettop.jpg|Large Cabinet Top]]
Changed lines 11-17 from:
    * Put all hand power tools in Equipment Room
    * Throw away all trash
    * Sweep floor
    * Close cabinets
   
* Close doors to power tool shop

to:
* Put all hand power tools in Equipment Room
* Throw away all trash
* Sweep floor
* Close cabinets
*
Close doors to power tool shop

Changed lines 19-52 from:
    * Put all Hand tools away
    * Put Soldering Irons in Equipment Room
    * Put all student projects on shelves with names labeled on them
   
* Check that the tool drawers are in order:

         
** Large Cabinet Top
         
** Both Cabinets
   
    ** Clamp drawer
          ** Drillbits
         
** Goggles and safety gear
          ** Hammers
          ** Handsaws, blades, etc.
          ** Multimeters
          ** Nut drivers
          ** Pliers, tin snips, etc.
          ** Rivet tools
          ** Sandpaper, dremel, etc.
          ** Screwdrivers
          ** Sockets
          ** Tape, Staple Guns, etc.
          ** Tape Measures
          ** Wire Cutters
          ** Cutting Blades

    * Identify any damaged tools, email [[mailto:itp.helpdesk@nyu.edu?subject=phys%20comp%shop | itp.helpdesk@nyu.edu]]
    * Put any unidentified parts in a blue bin on the worktable
    * Put any leftover wire or electronic parts in appropriate bins in cabinet
    * Sweep all tabletops
    * Sweep floor
    * Close cabinets
    * Initial your name on the cleanup schedule
   
* Turn off lights

to:
* Put all Hand tools away
*
Put Soldering Irons in Equipment Room
* Put all student projects on shelves with names labeled on them
* Check that the tool drawers are in order:

** Large Cabinet Top
** Both Cabinets
** Clamp drawer
** Drillbits
** Goggles and safety gear
** Hammers
** Handsaws, blades, etc.
** Multimeters
** Nut drivers
** Pliers, tin snips, etc.
** Rivet tools
** Sandpaper, dremel, etc.
** Screwdrivers
** Sockets
** Tape, Staple Guns, etc.
** Tape Measures
** Wire Cutters
** Cutting Blades

* Identify any damaged tools, email [[mailto:itp.helpdesk@nyu.edu?subject=phys%20comp%shop | itp.helpdesk@nyu.edu]]
* Put any unidentified parts in a blue bin on the worktable
* Put any leftover wire or electronic parts in appropriate bins in cabinet
* Sweep all tabletops
* Sweep floor
* Close cabinets
* Initial your name on the cleanup schedule
* Turn off lights

Changed lines 54-60 from:
    * Clean up as much as possible
    * Get all the names and email addresses of people still working
    * Email those names to itp.helpdesk@nyu.edu and tom.igoe@nyu.edu
    * Inform those people that they should clean up the rest of the shop
   
* Show them where this checklist is

to:
* Clean up as much as possible
* Get all the names and email addresses of people still working
* Email those names to itp.helpdesk@nyu.edu and tom.igoe@nyu.edu
* Inform those people that they should clean up the rest of the shop
* Show them where this checklist is

Changed lines 62-64 from:
    * Do everything on this checklist;
    * even if it is not your day to clean up.
   
* even if you didn't make the mess.
to:
* Do everything on this checklist;
* even if it is not your day to clean up.
*
even if you didn't make the mess.
Changed lines 6-10 from:
    *Sweep / vacuum all surfaces, including
          **the power tools - don't leave a layer of dust on them
          **table tops
          **behind power tool tables
   
* Make sure the lab assistants shut off power tools
to:
*Sweep / vacuum all surfaces, including
**the power tools - don't leave a layer of dust on them
**table tops
**behind power tool tables
*
Make sure the lab assistants shut off power tools
Changed lines 6-9 from:
   * Sweep / vacuum all surfaces, including
          ** the power tools - don't leave a layer of dust on them
          ** table tops
          ** behind power tool tables
to:
   *Sweep / vacuum all surfaces, including
          **the power tools - don't leave a layer of dust on them
          **table tops
          **behind power tool tables
Added lines 1-64:
If you're taking a physical computing class this semester, or if you're planning a physical computing project for your thesis or another class, you need to sign up for TWO DAYS of shop cleanup during the semester.

Anyone using the shop for any project this semester is expected to sign up for cleanup.

Power tool area
    * Sweep / vacuum all surfaces, including
          ** the power tools - don't leave a layer of dust on them
          ** table tops
          ** behind power tool tables
    * Make sure the lab assistants shut off power tools
    * Put all hand power tools in Equipment Room
    * Throw away all trash
    * Sweep floor
    * Close cabinets
    * Close doors to power tool shop


Main Shop area
    * Put all Hand tools away
    * Put Soldering Irons in Equipment Room
    * Put all student projects on shelves with names labeled on them
    * Check that the tool drawers are in order:

          ** Large Cabinet Top
          ** Both Cabinets
          ** Clamp drawer
          ** Drillbits
          ** Goggles and safety gear
          ** Hammers
          ** Handsaws, blades, etc.
          ** Multimeters
          ** Nut drivers
          ** Pliers, tin snips, etc.
          ** Rivet tools
          ** Sandpaper, dremel, etc.
          ** Screwdrivers
          ** Sockets
          ** Tape, Staple Guns, etc.
          ** Tape Measures
          ** Wire Cutters
          ** Cutting Blades

    * Identify any damaged tools, email [[mailto:itp.helpdesk@nyu.edu?subject=phys%20comp%shop | itp.helpdesk@nyu.edu]]
    * Put any unidentified parts in a blue bin on the worktable
    * Put any leftover wire or electronic parts in appropriate bins in cabinet
    * Sweep all tabletops
    * Sweep floor
    * Close cabinets
    * Initial your name on the cleanup schedule
    * Turn off lights


IF THERE ARE STILL PEOPLE WORKING AFTER YOU LEAVE:
    * Clean up as much as possible
    * Get all the names and email addresses of people still working
    * Email those names to itp.helpdesk@nyu.edu and tom.igoe@nyu.edu
    * Inform those people that they should clean up the rest of the shop
    * Show them where this checklist is


IF YOU ARE THE LAST PERSON (or people) HERE:
    * Do everything on this checklist;
    * even if it is not your day to clean up.
    * even if you didn't make the mess.
  Edit | View | History | Print | Recent Changes | Search Page last modified on August 03, 2005, at 01:49 PM