Building…
Finished some more of the top section, just have to add the basin, basin bracing and plywood facing, inside ceiling, and top floor part. Oh, and waterproofing the hell out of it. Thanks to Aki, Megu, Pau, and Edgcumbe for the lift! And then Edgcumbe stuck around and we cut some of the walls. He is a table saw. Thank godge for him. Getting a better sense of the space– and the acoustics… gonna be tough to figure that one out.
View from camera 1, top left corner:
View from camera 3, right middle height:
View from camera 2, down center:
This is the 4′x4′ sheet of 1/2″ thick polycarbonate. Have to bolt it to the frame. Also, missing is the angle of steel that will go across the long 2×4 as bracing. It’s clear, but there’s protective film covering both sides.
Tags: art, performance, RATS






