« FIRST CLASS | Main | SENSORS MANUFACTURER LETTER »

TIMETABLE

TIMETABLE OF PROGRESS

For the Tsunami piece the timetable could go on forever, I definitely need to pick only a section of the piece that is possible to tackle this semester. But since I had started research on the topic a while ago, I have enough material to read and study that I can arrange the 5 milestones in such a way:

1. Read and Go through all sketches, ideas, notes I already have and organize. Also, read and study all the research materials, books, articles, dvds and vcds I have collected so far. Start narrowing down what aspects, what angles and elements I want to focus on overall and then isolate the ones that it's feasable for me to work on this semester.

2. Sketch and design the new elements to the installation. Afterwords start compiling list of materials needed and sources to get those materials from.

3. Keep collecting materials necessary for making the parts of the installation I decided to focus on. Possibly begin construction and assembly.

4. Keep constructing and keep prototyping.

5. More prototyping and building.

I am not sure yet how many days or weeks some of the steps will take, as I start the process I will realize in what kind of shape I am.

For the House is Past project there are steps missing that I will list in this order:

1. Finish the random fickering generator and finish enclosing the circuitry in a container.

2. Continue research on how and where to print my soundscape on record. Possible test-presses.

3. Document all progress.

3. Re-organize material to submit to galleries.

4. AT ANY TIME GET HELP IN DESIGNING AND GETTING MY WEBSITE STARTED

TrackBack

TrackBack URL for this entry:
http://itp.nyu.edu/~bp432/cgi-bin/mt/mt-tb.cgi/51